TECHNICAL INFORMATION

BAKIRKOY - BAHCHELIEVLER - KIRAZLI METRO LINE

GENERAL INFORMATION

9 km long BAKIRKOY - BAHCHELIEVLER - KIRAZLI METRO LINE connects Bakirkoy, Bahchelievler, Gungoren and Bagcilar districts.

STATIONS

BAKIRKOY - BAHCHELIEVLER - KIRAZLI METRO LINE consists of 8 stations.
Bakirkoy IDO
Ozgurluk Meydani
Incirli
Haznedar
Ilkyuva
Yildiztepe
Molla Gurani
Kirazli

INTEGRATION POINTS

BAKIRKOY - BAHCHELIEVLER - KIRAZLI METRO LINE;

The Line Which will be Integrated The Station Which will be Integrated
M3 Kirazli - Olimpiyat - Metrokent - Kayashehir Metro Line
Incirli Station
Ikitelli Industrial Station
Incirli Station
Incirli Station
Incirli Station

TRAVEL TIME

With BAKIRKOY - BAHCHELIEVLER - KIRAZLI METRO LINE;

• Bakirkoy - Kirazli 13,5 minutes
• Bakirkoy- Etiler 31,5 minutes
• Bakirkoy - Maltepe 47.5 minutes
• Bakirkoy IDO - Basaksehir 25.5 minutes
• Basaksehir - Bakirkoy IDO 26,5 Minutes
• Bakirkoy Square – Ataturk Airport 11 Minutes
• Kirazli - Halkali Marmaray 14 minutes
• Kirazli – Incirli 7,5 Minutes

PASSENGER CAPACITY

BAKIRKOY - BAHCHELIEVLER - KIRAZLI METRO LINE will serve 70 thousand passengers per hours in one direction.

INFORMATION

1. Employer: Ministry of Transport, Maritime Affairs and Communications / General Directorate of
    Infrastructure Investments
2. Advisor: Yuksel Proje International Inc.
3. Contractor:AGA ENERGY TRANSPORT MINING CONSTRUCTION INDUSTRY AND TRADE INC.
4. Job Title: Bakirkoy- Bahcelievler- Kirazli Metro Line Construction and Electromechanics
    Supply, Installation and Operation of Systems
5. Short job title: Bakirkoy Bahcelievler-Kirazli Metro
6. Start date: 13.03.2015
7. Completion date: 24.06.2018
8. Number of stations: 7
    3 scissors structure
9. Station names:
    a. Bakirkoy IDO Station
    b. Ozgurluk Meydani Station
    c. Incirli Station
    d. Haznedar Station
    e. Ilkyuva Station
    f. Yildiztepe Station
    g. Molla Gurani Station
10. Project length: about 8.6 km
11. Average number of employees: 850 people
12. Total used / structured (Project sum and up to now)
    a. Total Iron: 60 000 Ton Manufactured: 20 000 Ton
    b. Total Concrete: 520 000 m3 Manufactured: 160 000 m3
    c. Total Excavation: 1 500 000 m3 Done: 600 000 m3